Skip to Content
S7-1200 Micro Box - Installation, Commissioning and Operation

S7-1200 Micro Box - Installation, Commissioning and Operation

Everything an installer, commissioning technician or maintenance electrician needs to put a THINK-PLC S7-1200 Micro Box (LL-4X-S71200) into service and keep it running.

The course covers the panel itself, field installation, first power-up, the KTP400 operator interface, the standard lead/lag pump control logic, optional Ewon remote access, and routine maintenance.

Responsible Bobby Cole
Last Update 08/16/2026
Completion Time 2 hours 45 minutes
Members 1
  • Start here
    2Lessons · 10 min
    • About this course
    • Data sheet - LL-4X-S71200
  • 01 - Overview and specifications
    2Lessons · 20 min
    • What the Micro Box is
    • Ratings, and reading the nameplate
  • 02 - Installation
    2Lessons · 25 min
    • Mounting and environment
    • Power and field wiring
  • 03 - Commissioning
    2Lessons · 30 min
    • First power-up checks
    • KTP400 operator interface
  • 04 - Lead/lag control
    3Lessons · 50 min
    • How the standard logic works
    • Configuring devices and setpoints
    • Alarms and fault handling
  • 05 - Remote access
    1Lessons · 15 min
    • Ewon Flexy 205 setup
  • 06 - Maintenance and support
    2Lessons · 15 min
    • Routine checks
    • Support and spares